China supplier made in China replacement parts in Yazd Iran Factory High Efficiency Chain Link Fence Machine with top quality

China supplier made in China  replacement parts  in Yazd Iran  Factory High Efficiency Chain Link Fence Machine with top quality

We – EPG Team the largest gearbox & motors , couplings and gears factory in China with 5 different branches. For much more details: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828

I. Specification
1. Mesh width and mesh opening can be customized.
two. Application: thoroughly utilized as fences for playground and gardens, highway, railway, airport, port, and many others.
II.Technological Parameter

Max. weaving width 4m
Max weaving length 20m
Mesh opening twenty five-80mm
Wire diameter two-4mm
Raw content Galvanized wire, PVC Coated wire, and so on.
Servo Motor five.5 KW
Motor for aspect dealing 1.5 KW
Motor for parting instrument 1.5 KW
Motor for winding .75 KW
Output one hundred twenty to 180 sq. meters/hour.
Electrical method 1.Japan Mitsubishi PLC origin
2.Servo motor 
3.French Schneider (Reduced-voltage electrical technique) 
4.Electrical & Machinery from ZheJiang Teco Digital
Handle system PLC computerized controller
Bodyweight 3900kg
Dimension Main machine: 6700*1430*1800mm
                         5100*1700*1250mm

III.Advantages
one. ZheJiang Delta Servo motor five.5kw +Planetary Reducer (rate 1:3)
2. Original Japan Mitsubishi PLC + Touch  screen
3. Alarm unit + Emergency button
four. One mould, double spiral
five. 12-procedure processed Straightening wheels
six. Computerized mesh roller
seven. 3 techniques of mesh sides
8. Schneider Reduced-Voltage electronics.
IV.Images

V.Business Conditions
1. Payment
: 30% T/T in advance, the harmony 70% by T/T after check out the equipment at seller’s factory.
two. Minimal get quantity: 1 set 
3. Certification: ISO 9001 Certificate
5. Delivery time: 30 days from obtained your payment in progress.
six. Nation of origin: China
7. Our ensure time: twelve months after the equipment is accepted by the purchaser, however, the assure period of time is no for a longer time than 18 months soon after equipment’s departure from Xihu (West Lake) Dis.g port,
China.
eight. Installation: we could prepare our engineer put in the equipment in your manufacturing unit.
VI. Make contact with Information

             
 

The use of authentic products manufacturer’s (OEM) part quantities or emblems , e.g. CASE® and John Deere® are for reference reasons only and for indicating item use and compatibility. Our organization and the shown replacement parts contained herein are not sponsored, approved, or produced by the OEM.

China supplier made in China  replacement parts  in Yazd Iran  Factory High Efficiency Chain Link Fence Machine with top quality

China supplier made in China  replacement parts  in Yazd Iran  Factory High Efficiency Chain Link Fence Machine with top quality