
With a lot of years’ knowledge in these traces, we have been distinguished from other suppliers in China by our advantages in aggressive pricing, on-time supply, prompt responses, on-hand engineering help and very good right after-income companies. Our product selection involves all varieties of helical equipment, spur equipment, bevel equipment, equipment rack, worm gear, sprockets,chains, bearings. assures the stability and consistency of the crucial perform of factors. EPTyi Brand name 6 Seats Electric Club Car with Cargo Box
Solution Description
| TianEPTT EPTyi Electrical EPT 6 Seat Golf Cart | |||||
| Loading capacity | six man or woman | Max Speed | twenty five-28km/h(adjustable) | ||
| Driving selection | 70-80km | Climbing ability | le20% | ||
| EPTTler | InEPTT brand individually excited | ||||
| EPT | 48V/4KW separated fired up motor | ||||
| Battery | Massive capability deep cycle guide-acid battery 8V/piece six items | ||||
| Charger | Personal computer EPTT charger input/output 220V/48V, working existing 25A | ||||
| Charging time | 8hrs | ||||
| Top | Car engineering substance injunction molding | ||||
| Human body | Injunction molding modeling layout separable replacement | ||||
| Windshield | Laminated EPT with wiper | ||||
| Seats | Sponge seat with security belt for every seat | ||||
| Instrument board | PP substance injunction molding Electrometer, Entrance ligEPTT switch, turning ligEPTT switch, electric lock change, shift change | ||||
| EPTing and signal | Front light-weight, turning gentle, tail mild, horn and buzzer | ||||
| Steering Sys | EPT steering, automobile backlash compensation | ||||
| Brake Sys | Rear brake composite pedal brake | ||||
| Entrance Axle amp Suspension | Non unbiased suspension, EPT cylindrical EPT EPT soak up | ||||
| Rear Axle amp Suspension | Integral rear axle, Non independent suspension, EPT, cylinEPTTtype EPT EPT absorb | ||||
| Tyre | Golfing cart tyre 18*eight.50-8 diameter 452mm | ||||
In depth Photographs
EPTT Display
-FAQ-
Q1. What is your EPTT method?
A: EPTTly, we pack our products in containers with iron frames. If you have any EPTT demands we could comply with accordingly.
Q2. What is your terms of payment?
A: By T/T, 30% as deposit, and 70% just before shipment.
Q3. What is the lead time?
A: It takes about ten-15 daEPTTafter acquiring deposit.
This fall. Can you make according to specialized drawings?
A: Sure, we can make in accordance to your technical drawings. We can create molds and fixtures.
Q5. What is your sample policy?
A: Because this product is large-price item, we can settle for sample by price reduction. Must the orEPTTbe big in amount, we could even consiEPTTrefunding for the sample.
Q6. Do you take a look at all your goods before supply?
A: Of course, we have one hundred% examination prior to supply
Q7: How do you make our organization EPTT-expression and very good relationship?
A: 1. We guarantee very good quality and good value to make sure our customers’ benefits
two. We reXiHu (West EPT) Dis.Hu (West EPT) Dis.d each and every consumer as our buddy and do enterprise sincerely.
Q8: The place is your manufacturing unit primarily based in?
A: Our manufacturing unit is primarily based in Panzhuang EPTT Park, XiHu (West EPT) Dis.hu (West EPT) Dis. District, TianEPTT, EPTT. Welcome to vist us.

